Projects
Zvezda Shipbuilding Complex – Bolshoy Kamen
Solution Delivered
Engineered storage and pumping infrastructure for water supply and wastewater management, including prefabricated tanks and sewage pumping stations (SPS).
System Configuration
Potable Water Storage Tank – 35 m³
Underground Water Storage Tank – 60 m³
Wastewater Storage Tank – 120 m³
Underground Grease Separator – 10 L/s capacity
Packaged Sewage Pumping Stations (SPS)
2026-05-05 14:15